Electrical planning progress
0 of 24 checks
0% verified
Plan electrical points, circuit capacity, protection and conduit routing before slabs and finishes are closed. Review every final layout with a licensed electrical professional.
Loading saved progress…
Electrical planning progress
0 of 24 checks
0% verified
Critical high-load circuits
0 / 14 verified
Review appliance loads, circuit design and protection before wiring is concealed.
Cable sizes depend on load, cable length, installation method, ambient conditions, voltage drop and protective devices. Have a licensed electrician select and document each circuit size; do not use a generic size chart as an installation specification. Verify cable markings and applicable current standards before work is concealed.
Interactive MEP tool
Verify an item after discussing it with your electrician and reviewing the relevant drawing or test record.
Plan a way to control the entrance and hallway lights from the locations where people enter and leave.
Standard / planning reference
Coordinate switching locations with the electrical layout
Evidence to collect: Switching diagram checked before conduit installation
Risk if skipped: A poorly placed switch can leave the entry or hallway dark when lights need to be switched off.
Tip: Agree switch locations during the conduit layout, before plastering.
Plan accessible power and data near the console and a separate, pullable conduit for low-voltage TV cables. Keep electrical power and signal wiring separated as required by the electrician.
Standard / planning reference
Smooth, accessible conduit route coordinated with the TV mount
Evidence to collect: Elevation showing outlets, console and TV locations
Risk if skipped: Missing outlets or a blocked conduit can leave visible cables or make later changes difficult.
Have a licensed electrical professional size a dedicated circuit, isolator, conductor and protective device for the selected air conditioner and site conditions.
Standard / planning reference
Circuit and conductor sized for the selected AC and installation
Evidence to collect: Load schedule and protective-device rating approved by electrician
Risk if skipped: An undersized or shared circuit can overheat, trip or fail to safely supply the appliance.
Tip: Confirm the AC nameplate, cable route, isolator location and outdoor-unit position before closing walls.
Consider low-glare night-light points for corridors and stairs, with switching or controls suited to the household.
Standard / planning reference
Locations coordinated with finished floor and stair levels
Evidence to collect: Lighting plan showing switch/control and fixture positions
Risk if skipped: Without low-level lighting, nighttime movement may rely on brighter room lights.
Locate a suitable, accessible outlet near the refrigerator and coordinate its circuit with the kitchen switching plan so the appliance is not inadvertently isolated.
Standard / planning reference
Circuit arrangement reviewed against appliance load and kitchen controls
Evidence to collect: Kitchen elevation and circuit schedule
Risk if skipped: An inaccessible outlet or accidental isolation may interrupt the refrigerator supply.
Tip: Confirm ventilation clearances and the final refrigerator location with the kitchen supplier.
Share the appliance nameplate ratings with the electrician so the supply, circuit protection and any required separate circuits are designed for the actual combined and individual loads.
Standard / planning reference
Load schedule and circuit separation determined by a licensed electrician
Evidence to collect: Appliance ratings and distribution-board schedule
Risk if skipped: Putting high-load appliances on unsuitable shared circuits can cause overheating or repeated tripping.
Place an accessible outlet where it remains reachable and clear of hot surfaces, the duct path and any service access requirements.
Standard / planning reference
Location confirmed against chimney and cabinet manufacturer drawings
Evidence to collect: Kitchen elevation with outlet position and access
Risk if skipped: A misplaced outlet can conflict with cabinetry or leave an exposed cable.
Plan suitable, accessible power for the RO purifier and dishwasher while keeping outlets and connections positioned safely relative to water sources.
Standard / planning reference
Electrical outlet placement coordinated with water connections
Evidence to collect: Under-sink and appliance layout reviewed by electrician and plumber
Risk if skipped: Crowded service areas can expose connections to leaks or make maintenance difficult.
Provide enough properly rated outlets for the planned appliances. Have the electrician confirm circuit loading, outlet type and safe clearances from the sink and cooktop.
Standard / planning reference
Outlet quantity, location and circuit capacity checked against appliance loads
Evidence to collect: Countertop elevation and kitchen load schedule
Risk if skipped: Too few outlets can encourage extension boards or adapters that are unsuitable for high-load appliances.
Provide convenient room-light controls and appropriately rated charging outlets on each intended bedside, with final heights checked against finished furniture.
Standard / planning reference
Switchboard height coordinated with finished bed and nightstand
Evidence to collect: Bedroom furniture plan and bedside switchboard elevation
Risk if skipped: Poorly placed controls and outlets can be blocked by furniture or require unsafe extension leads.
Coordinate the AC supply and isolator with the equipment position, refrigerant pipe route, condensate drainage and outdoor-unit access.
Standard / planning reference
Electrical, refrigerant and condensate routes coordinated
Evidence to collect: Bedroom wall elevation showing indoor and outdoor AC locations
Risk if skipped: Uncoordinated routes can require visible trunking or later wall alterations.
Plan suitable outlets and a data point at the intended desk location, with separate pathways for mains and low-voltage wiring as required.
Standard / planning reference
Desk elevation with outlet and data positions
Evidence to collect: Furniture plan confirming desk location and cable access
Risk if skipped: A missing point may result in trailing extension cables or inconvenient connectivity.
If internal wardrobe lighting is planned, provide a suitable conduit and accessible driver location before cabinetry is installed.
Standard / planning reference
Route and driver access agreed with carpenter and electrician
Evidence to collect: Wardrobe elevation showing light feed and accessible driver location
Risk if skipped: Retrofitting a feed after the wardrobe is finished can mean exposed wiring or surface damage.
Have a licensed electrician select the point, isolator, circuit protection and clearances for the geyser using the applicable bathroom-zone requirements and the manufacturer's instructions.
Standard / planning reference
Placement and protection confirmed against applicable wiring rules
Evidence to collect: Bathroom electrical layout approved by a licensed electrician
Risk if skipped: Incorrect placement or protection near water can create electric-shock and equipment hazards.
Tip: Do not rely on a generic height alone; confirm the actual bathroom layout and applicable standard.
If planned, coordinate mirror lighting and any outlet with the basin, splash exposure, mirror product and applicable bathroom electrical requirements.
Standard / planning reference
Bathroom location and enclosure rating confirmed by electrician
Evidence to collect: Vanity elevation and product specifications
Risk if skipped: An outlet too close to water or incompatible with the location can create a shock hazard.
Plan the fan supply and a suitable discharge route to an approved exterior opening or ventilation shaft.
Standard / planning reference
Fan location and discharge route coordinated with building design
Evidence to collect: Ventilation and electrical layout
Risk if skipped: A fan without an effective discharge route may not adequately remove moisture and odors.
Coordinate a suitable supply with the washing-machine location, water tap and drain. Have the electrician verify protective earthing and circuit protection using appropriate test equipment.
Standard / planning reference
Circuit, protective device and earthing tested by qualified electrician
Evidence to collect: Utility layout and recorded electrical test results
Risk if skipped: Water exposure combined with faulty electrical installation can cause severe electric shock.
Tip: Keep electrical outlets and connections away from likely leaks and water spray.
If outdoor outlets are needed, ask the electrician to select suitable weather protection, placement, wiring method and circuit protection for the site's rain and exposure conditions.
Standard / planning reference
Enclosure rating selected for the actual exposure and installation
Evidence to collect: Product rating, installation detail and circuit protection
Risk if skipped: Indoor-rated fittings exposed to rain or damp may corrode, fail or create an electrical hazard.
If EV charging is planned or may be added later, ask a qualified professional to assess supply capacity, cable route, earthing and protection for the intended charger. Provide an accessible pathway if feasible.
Standard / planning reference
Supply capacity and charger protection designed to selected equipment
Evidence to collect: Parking-to-meter route, spare capacity and electrician's design
Risk if skipped: A domestic outlet or improvised extension may not be suitable for sustained EV charging loads.
Tip: Do not assume a single conductor size, breaker rating or protection type fits every charger and installation.
Have the electrician select and test appropriate residual-current and overcurrent protection for the installation, circuits, earthing arrangement and connected equipment.
Standard / planning reference
Protective-device selection verified against current applicable standards
Evidence to collect: Distribution-board schedule and electrician's test report
Risk if skipped: A conventional overcurrent device alone may not provide the required protection against all earth-leakage faults.
Tip: Protection type, sensitivity and coverage must be selected by the responsible electrical professional; do not infer safety from a test button alone.
List the intended backup loads and have the electrician design the inverter circuit, neutral arrangement, changeover, isolation and labelling.
Standard / planning reference
Approved single-line diagram with safe isolation and changeover
Evidence to collect: Essential-load schedule and electrician-approved inverter diagram
Risk if skipped: Incorrectly interconnected supplies can overload the inverter or energize circuits unexpectedly.
Have the responsible electrician design the earthing and bonding system for the building, supply and site conditions, then record the required commissioning tests.
Standard / planning reference
Electrode design and acceptance values determined for the installation
Evidence to collect: Earthing layout and recorded tests by a qualified professional
Risk if skipped: An unverified or deteriorated earthing system can compromise fault protection.
Tip: Earth-resistance acceptance criteria depend on the applicable design and installation; confirm project-specific values with the electrician.
Require the electrician to document conductor material, cross-section, insulation and protection for each circuit. Sizing must account for connected load, cable length, installation conditions and applicable standards.
Standard / planning reference
Cable sizing verified for load, length, installation method and protection
Evidence to collect: Approved circuit schedule and visible cable markings before concealment
Risk if skipped: Undersized conductors can overheat; one generic wire-size chart cannot safely cover every circuit.
Tip: Photograph cable markings and the circuit schedule before wiring is concealed.
Before final handover, have a qualified electrician carry out and document the insulation, continuity, polarity, earthing and protective-device tests required for the installation.
Standard / planning reference
Testing procedure and acceptance criteria set by applicable standards
Evidence to collect: Signed test report for circuits and protective devices
Risk if skipped: Unrecorded testing can leave wiring faults undiscovered until equipment trips or fails.
Electrical planning notes
Use this checklist to coordinate decisions and collect evidence, not as wiring instructions. Device types, ratings, test methods and acceptance values must be confirmed for the installation by a qualified professional.
Ask the electrician to document the selected residual-current protection, circuit coverage, earthing and commissioning tests.
Base conductor size and protective-device selection on the actual load, route, installation conditions and applicable standards.
Review service capacity, isolation, changeover, earthing and dedicated routes before the building is finished.
Planning aid only, not electrical or engineering advice. Electrical installation and testing must be designed, performed and verified by qualified professionals under applicable current standards and local requirements. Do not work on live circuits.